Back To Top

Airport Terminal 5

The Fifth Terminal (TR-5) has a total area of ​​approximately 100,000 square meters, to accommodate 12 million passengers annually for domestic flights. It was opened in 2016 and contains eight double gates connecting the terminal directly to aircraft, in addition to logistical facilities that include the construction of a road network connecting the regions. The development on the main road to and from the city of Riyadh and the current terminals, and multi-storey parking for 3000 cars, and after transferring passengers from the third to the fifth terminal, the development of the third and fourth terminals began after signing with a consortium led by a German company with a value of 5.4 billion riyals, so that the airport could accommodate 24 Million passengers a year. Serves passengers on all domestic flights via Saudi Airlines, Nas, Saudi Gulf Airlines, Nesma Airlines and FlyAdel.

TELL ME MORE

Make a splash with WaveRide, designed for everyone passionate about all things surfing.

156-677-124-442-2887
info@wordpress.com
184 Main Collins Street Victoria 8007
Follow Us:
Copy link
Powered by Social Snap